The project took place in the highlands, at elevations ranging from 3050 to 3300 meters, amidst rocky and rugged terrain.
The primary goal of the project was to minimize the need for extensive exploration drilling.
After analyzing the interpretation data, mine operator proceeded with exploratory drilling, which led to the identification of a significant fault zone with substantial thickness.